**UPDATE: EXTENDED TIMELINE** Due to weather and additional excavations needed, this project has been extended until next Friday, December 18. With the current weather forecast, no work was performed on Dec. 11 and no work will be performed on Dec. 14.** A contractor hired by Draper City will be working within the roadway of Deer Ridge Dr. between Seven Oaks Ln. and Elk Glen Dr. from Dec. 7 - Dec. 18. The work being performed is for evaluating the condition of the infrastructure prior to the reconstruction project on Deer Ridge Rd. in 2021. If you have any questions, contact Project Engineer Eric Lundell at eric.lundell@draper.ut.us or 801-576-6365. Download PDF.